The original Complete Streets Committee was appointed 5/21/2019 by Town Board resolution 142-2019. Minutes can be accessed from woodstockny.gov/index.php?cID=985. The resolution text is also available in the attached file.
The current Complete Streets Committee was established 6/21/2022 by Town Board resolution 138-2022. The current committee was established as an advisory committee to the Woodstock Town Board regarding the Town’s Complete Street Policy, which the Complete Streets Committee appointed in 2019 produced, and was adopted by the Town Board on May 31, 2022. Minutes can be accessed from woodstockny.gov/index.php?cID=985. The resolution text is also available in the attached file.
| Grace Murphy Chair Term: 12/31/27 |
| Kevin Bliss Member Term: 12/31/26 |
| Howard Cohen Member Term: 12/31/26 |
| Jeffrey Viglielmo Member Term: 12/31/26 |
| Robyn Pollins Member Term: 12/31/26 |
| Mary Smith Member Term: 12/31/26 |
| Jay Decker Member Term: 12/31/26 |
| Jim Bogner Alternate |
| Eva Myrth Robbins Alternate |
| Kevin Smith Complete Streets Liaison to Various County Committees |

| 12/1/2026 | Link to Calendar entry to see 12/1/2026 Minutes when available |
| 11/17/2026 | Meeting Cancelled |
| 10/27/2026 | Link to Calendar entry to see 10/27/2026 Minutes when available |
| 9/22/2026 | Link to Calendar entry to see 9/22/2026 Minutes when available |
| 8/25/2026 | Link to Calendar entry to see 8/25/2026 Minutes when available |
| 7/28/2026 | Link to Calendar entry to see 7/28/2026 Minutes when available |
| 6/23/2026 | Link to Calendar entry to see 6/23/2026 Minutes when available |
| 5/26/2026 | Link to Calendar entry to see 5/26/2026 Minutes when available |
| 4/28/2026 | Link to Calendar entry to see 4/28/2026 Minutes when available |
| 4/6/2026 | Link to Calendar entry to see 4/6/2026 Minutes when available |
| 3/31/2026 | Meeting Cancelled |
| 2/24/2026 | Link to Calendar entry to see 2/24/2026 Minutes when available |
| 2/10/2026 | Link to Calendar entry to see 2/10/2026 Minutes when available |
| 1/27/2026 | Link to Calendar entry to see 1/27/2026 Minutes when available |
When available, Complete Streets Committee 2026 meeting documents will be placed here.
Regarding the Catskill Mountain Railroad proposal to extend their existing railroad, the October 14, 2026, report, known as the Comprehensive Analysis of Undesignated Section of U&D Corridor, created by Barton and Loguidice, created for the Ulster County Legislature Housing & Transportation Committee, can be found at legislature.ulstercountyny.gov/wp-content/uploads/2026/10/Final-Feasibility-Study-Report-Draft-UD.pdf.
The Woodstock Town Board passed Resolution 96-2024 on 4/9/2024 regarding the County owned U&D Corridor, where a portion is in Woodstock. Minutes can be accessed from woodstockny.gov/index.php?cID=985. The resolution text is also available in the attached file.
Press Release following Town Board April 9, 2024 resolution:
NYS DOT PIN 8122.20
In 2022 the Complete Streets committee met with NYSDOT and members of the Woodstock Town Board for a walk through of the project to renew the bridges between the Village Green and the Woodstock Post Office. We hoped we could influence the project to ensure enhanced safety and accessibility of our local infrastructure. The Committee began a multi-year effort to research our options. In order to understand what we needed to improve safety and accessibility and communicate effectively with the DOT, we obtained a grant to hire an engineer with experience working with the DOT on these kinds of projects and a history of success with the DOT.
With the grant obtained by the Complete Streets committee, the Woodstock Town Board hired Lindsay Zefting, P.E., of Verity Engineering, D.P.C. to modify and improve the DOT plan. The goal was to create a design which was aligned with the values of Woodstock, a rural arts community, while using Complete Streets design principals for safety and accessibility. The Town Board asked Lindsay to include a lowered speed limit, enhanced crosswalks, bump-outs for better visibility at intersections and tree pits for as many trees as possible, including a minimum of a tree planted for any tree removed.
The first version of the design created by Lindsay Zefting for the Town was delivered to the community on the 24th of March 2026 at a meeting at the community center.
The following documents were also presented by Lindsay at the March 24, 2026, community meeting.
The Part 1 map document includes modifications from Verity Engineering as follows: Two Concepts: 1) Side Path option - later withdrawn, and 2) Sidewalks that include additional crosswalks tree pits and bump-outs.
The Part 2 map document includes modifications from Verity Engineering as follows: Two Concepts: 1) Side Path option - later withdrawn, and 2) Sidewalks that include additional crosswalks tree pits and bump-outs.
In April 2026 the Woodstock Town Board began having meetings with various committees to receive feedback about the DOT project. An example is the April 15, 2026, meeting including Supervisor Anula Courtis, members of Woodstock's Complete Streets Committee, members of Woodstock's Tree Committee, and Lindsay Zefting, to discuss attendee input on the DOT project plan. This recording of the April 15, 2026, meeting is courtesy of Howard Cohen, who announced he was recording and gave attendees the opportunity to object: Cohen April 15, 2026, Tinker Street DOT Project Meeting Recording. The beginning of this recording includes meeting attendee introductions.
In May the following design, modified with feedback from the March 24, 2026, community meeting, was submitted to NYS DOT: Route 212 Post to Village Green May 2026.
The Town Board submitted a request to the DOT in June 2026 for modifications of the project NYS DOT PIN 8122.20.
On September 24, 2026 the Town Board received their response to the June 2026 DOT request as described in these files.
Also, in September 2026 the Town requested a justification from the DOT for the items not accepted from our design requests.
In October 2026 the Town received this landscaping plan from the DOT for the Village Green to Post Office project, NYS DOT PIN 8122.20.